Alex is Sprintlaw’s co-founder and principal lawyer. Alex previously worked at a top-tier firm as a lawyer specialising in technology and media contracts, and founded a digital agency which he sold in 2015.
Do I really need a proper supply and install contract for every solar panel job?
Yes. If you're supplying panels, arranging installation, dealing with scaffolding, connecting inverters, relying on surveys and giving customers performance expectations, a written contract is one of the simplest ways to protect your margin and keep the project on track.
Solar projects can look straightforward at quote stage, then become messy once roof access, DNO approvals, kit availability or customer expectations come into play. A clear solar panel supply and install contract helps everyone know what's included, what's assumed and what happens if something changes.
Do You Need A Written Solar Panel Supply And Install Contract In The UK?
Yes, you should use a written contract for both domestic and commercial solar installation projects because your risk sits across products, workmanship, access, safety, payments and customer expectations.
A short quote and invoice usually won't be enough. Your customer needs to know what they're buying, and your business needs a clear basis to charge for changes, recover unpaid amounts and deal with delays that aren't your fault.
For domestic customers, your terms of sale also need to sit comfortably with the Consumer Rights Act 2015. In simple terms, your goods must be as described, of satisfactory quality and fit for purpose, and your services must be carried out with reasonable care and skill. If your contract tries to take away those basic rights, that clause may be unenforceable.
If you sell to consumers online, by phone or away from your business premises, you also need to think about the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013. These rules can give a customer a 14 day cooling-off period, unless an exception applies or you've taken the right steps before starting work.
For commercial projects, you may also need payment terms that work with the Housing Grants, Construction and Regeneration Act 1996. That regime can apply to many construction contracts, although there are exclusions, including contracts with a residential occupier.
A good contract doesn't just reduce legal risk. It makes your sales process cleaner because you're not reinventing the rules on every job.
What Should Your Contract Say About Surveys, Access And Grid Connection?
Your contract should say that the project depends on site survey results, safe access and grid connection requirements, because these are some of the biggest reasons solar jobs change after quote stage.
A pre-installation survey is where you find out whether the roof, electrics, access and layout match what you were told at enquiry stage. Your contract should make it clear whether your first quote is fixed, estimated or conditional on survey.
Survey Assumptions
Your survey clause should cover practical assumptions such as:
- whether the roof structure is suitable for the proposed system
- whether tiles, roof coverings or fixings can safely take the installation
- whether the existing electrical system can support the inverter and connection
- whether scaffolding, edge protection or specialist lifting equipment is required
- whether the customer has given accurate information about the property
- what happens if hidden defects are discovered after work starts
For example, say GreenPeak Solar quotes £9,800 for a domestic roof installation based on photos and a video call. At survey, the installer finds the roof access needs extra scaffolding and the consumer unit needs remedial work before connection. If the contract says the quote is subject to survey and variations must be approved in writing, GreenPeak can pause, explain the extra cost and get the customer's approval before ordering kit.
Grid Connection Assumptions
Your contract should also explain who is responsible for Distribution Network Operator processes. In Great Britain, smaller systems may fall under Engineering Recommendation G98, where the DNO is usually notified after installation. Larger or more complex systems may need prior approval under G99.
Don't promise a connection date if you're waiting on a DNO, landlord, freeholder, planning authority, network upgrade or third party electrician. Instead, say your timetable depends on approvals and information you don't control.
How Should You Structure Deposits, Payments And Delays?
You should structure payments so they reflect your real project costs, while staying fair and transparent for the type of customer you're dealing with.
Solar installers often need money upfront because panels, inverters, batteries, mounting equipment and scaffolding can create supply agreement and cash flow pressure before installation starts. A deposit clause can help, but it needs to be drafted carefully.
For consumer customers, a very large non-refundable deposit can raise fairness issues under the Consumer Rights Act 2015. A better approach is to explain:
- the deposit amount or percentage
- what the deposit covers, such as design work, administration or ordering equipment
- whether any part is refundable if the customer cancels
- what costs you can deduct if the customer cancels after you've started work or ordered bespoke goods
- when further stage payments and the final balance are due
If a domestic customer signs at home or online, be careful about starting within the 14 day cooling-off period. You may need the customer's express request to start early, and clear acknowledgement that they may have to pay for work done if they cancel after you've started. If the customer wants fully bespoke goods, the cancellation position may be different, but you shouldn't assume the whole project is exempt without checking the facts.
Your delay clause should also separate delays you control from delays you don't. You can be responsible for turning up with a competent team and doing the work with reasonable care and skill. You shouldn't automatically carry the risk of storms, unsafe roof conditions, DNO waiting times, customer-caused delays, unavailable access, delayed scaffolding caused by third parties or supply chain shortages outside your control.
For commercial customers, include a clear payment process for deposits, interim invoices, practical completion and late payment. If the construction payment rules apply, you'll need compliant payment notices and due dates, not just a casual invoice term.
What Warranties And Liability Clauses Can A Solar Installer Use?
You can use warranty and liability clauses, but they need to be accurate, fair and realistic rather than promising more than you can control.
Most solar projects involve several layers of warranty. Your contract should clearly separate them so the customer doesn't assume every issue is your personal responsibility for 25 years.
Equipment Warranties
Solar panels, inverters, batteries and mounting systems often come with manufacturer warranties. Your contract should say:
- which products are being supplied, including model numbers where possible
- what manufacturer warranties apply and who provides them
- whether warranties are passed through to the customer
- what the customer must do to keep warranties valid, such as using approved monitoring, avoiding unauthorised modifications or following maintenance guidance
- whether labour to remove and reinstall faulty equipment is included or excluded from the manufacturer's warranty
Workmanship Warranties
Your workmanship warranty is different. This is your promise about the quality of your installation work. It should say how long it lasts, what it covers, how the customer makes a claim and what remedies you'll offer if there's a genuine workmanship defect.
Be careful with performance estimates. If you provide savings projections or generation forecasts, say what assumptions they rely on, such as shading, roof orientation, weather, electricity prices, usage patterns and system availability. Don't guarantee a specific bill saving unless you're genuinely prepared to stand behind it.
Liability Limits
Your liability clause can limit some commercial risks, but there are legal limits. Under the Unfair Contract Terms Act 1977, you can't exclude liability for death or personal injury caused by negligence. Other exclusions and caps may need to be reasonable, especially in business-to-business contracts.
For consumers, the Consumer Rights Act 2015 means terms must be fair and transparent. A clause that quietly removes key rights or leaves the customer with no practical remedy is unlikely to help you. The goal is to set sensible boundaries, not to pretend you have no responsibility at all.
Solar Panel Supply And Install Contract Template: What To Include
A solar installation services agreement template should be tailored before you use it, because small wording changes can make a big difference to deposits, cancellation rights, warranties and liability.
If you're building your first draft, use this outline as a starting point rather than a finished document:
- Parties and project details: set out your business details, the customer's details and the installation address.
- Scope of works: describe the system, equipment, design, installation services, commissioning and any exclusions.
- Survey and assumptions: explain what the quote relies on and what happens if the survey reveals extra work.
- Customer responsibilities: cover access, parking, pets, roof space, electrical access, permissions and accurate information.
- Grid connection and approvals: state who handles DNO notifications or applications, and how approval delays affect timing.
- Price and payment schedule: set out deposits, stage payments, final payment, VAT treatment if relevant and late payment consequences.
- Cancellation and cooling-off rights: include the right wording for domestic distance or off-premises sales where the regulations apply.
- Variations: require a written contract amendment for extra work, equipment substitutions or design changes.
- Delays and force majeure: explain what happens if weather, supply chain issues or third party approvals delay the job.
- Warranties: separate manufacturer warranties, workmanship warranties and any exclusions.
- Liability: include sensible exclusions and caps, while preserving rights that can't legally be excluded.
- Completion and handover: cover testing, commissioning, documentation, monitoring setup and customer sign-off.
- Complaints and defect process: set out how the customer reports issues and how you'll inspect and fix valid defects.
- Data protection: explain how you'll handle customer details, photos, monitoring data and subcontractor sharing under UK GDPR and the Data Protection Act 2018.
Templates can miss industry details, especially around G98 or G99 assumptions, scaffolding, batteries, roof condition and manufacturer warranty pass-throughs. A tailored contract is usually clearer for your team and easier for customers to accept.
What Should You Do If A Customer Raises A Workmanship Claim?
You should respond promptly, keep good records and follow a clear inspection process before accepting or rejecting responsibility.
Workmanship complaints can be stressful because they often arrive when your team has moved on to the next job. A calm process helps you protect the customer relationship while avoiding open-ended liability.
Start with these steps:
- Acknowledge the issue: confirm you've received the complaint and ask for photos, videos, dates and details of what's happened.
- Check your records:review the contract, survey notes, installation photos, commissioning records, handover documents and any customer sign-off.
- Inspect before deciding: arrange a site visit if needed, or ask a suitable technician to assess whether the issue relates to workmanship, product failure, customer use, weather damage or pre-existing property defects.
- Separate urgent safety issues: if there's a possible electrical or roof safety risk, deal with that first and document what you've done.
- Confirm the outcome in writing: explain whether you'll repair under warranty, charge for the work, refer the issue to the manufacturer or decline the claim with reasons.
For example, Mike runs a solar installation business in Leeds. A customer complains six months after installation that water is entering the loft near a mounting point. Mike checks the install photos, arranges an inspection and finds one flashing detail was installed incorrectly. His workmanship warranty covers it, so he repairs the flashing, pays for a local roofer to make good the affected area and records the fix in writing. Because his contract has a clear defect process, the issue is resolved without an argument over unrelated roof repairs.
If the customer is a consumer, remember that the Consumer Rights Act 2015 may give them remedies if the service wasn't carried out with reasonable care and skill. If the customer is a commercial client, your contract terms, limitation clauses and any construction payment rules may shape the outcome.
If a complaint becomes about unpaid invoices, alleged losses or reputational damage, get help early. The sooner your position is documented properly, the easier it is to avoid a small defect becoming a much bigger dispute.
Key Takeaways
- A written solar panel supply and install contract helps protect your cash flow, scope, timetable and workmanship obligations.
- Your quote should clearly say whether it's fixed or subject to survey, roof condition, access, electrical checks and DNO requirements.
- Deposits and cancellation terms need extra care for domestic customers, especially where cooling-off rights may apply.
- Separate manufacturer equipment warranties from your own workmanship warranty so the customer knows who is responsible for what.
- Liability clauses can help manage risk, but they need to be fair, transparent and legally enforceable.
- A clear complaints and defect process makes workmanship claims much easier to manage.
If you'd like help with your solar installation contracts, customer terms, warranty clauses or deposit and cancellation wording, you can reach us at 08081347754 or team@sprintlaw.co.uk for a free, no-obligations chat.