Alex is Sprintlaw’s co-founder and principal lawyer. Alex previously worked at a top-tier firm as a lawyer specialising in technology and media contracts, and founded a digital agency which he sold in 2015.
Maya runs a growing bakery and has found a shopfront that feels perfect: good foot traffic, space for a prep kitchen and room for a few tables. The rent looks manageable. Then the draft lease arrives, and one phrase keeps appearing: full repairing and insuring.
If you're reviewing a commercial lease, that phrase deserves your attention. It can mean your business is taking on repair and insurance costs that go far beyond day-to-day maintenance.
The good news is that an FRI lease doesn't have to be a deal-breaker. You just need to know what to check, what to ask for and where a survey or schedule of condition can save you from an expensive surprise later.
What Does An FRI Lease Mean?
An FRI lease usually means your business is responsible for repairing the premises and contributing to, or paying for, the landlord's building insurance.
FRI stands for full repairing and insuring. In a commercial lease in England and Wales, the exact meaning comes from the wording of the lease, not just the label on the front page.
In practice, an FRI lease may require you to:
- keep the premises in good repair and condition
- put the premises into repair, even if they weren't perfect when you moved in
- repair internal areas, and sometimes external or structural parts
- pay a fair share of repairs to common parts through a service charge
- reimburse the landlord for building insurance premiums
- comply with laws affecting your use of the property
- hand the premises back at the end in the condition required by the lease
This is why the FRI lease meaning is so important for small businesses. A lease that looks affordable on rent can become expensive if the roof, drains, electrics or shopfront need work.
FRI terms are common in UK commercial leases and retail leases, especially for shops, offices, warehouses and hospitality premises. They're not automatically unfair or unusual, but they do need a careful lease review before you sign.
Are FRI Lease Tenant Obligations Really That Broad?
Yes, FRI lease tenant obligations can be broad, especially if the lease says you must put and keep the premises in repair.
That wording matters. A clause requiring you to keep premises in repair may still be serious, but put and keep can mean you have to improve the condition if the property is already in disrepair when the lease starts.
For example, if the premises already have damaged plaster, cracked tiles and ageing pipework, you don't want to discover later that your business has agreed to fix all of it.
What Repair Obligations Usually Cover
Depending on the lease, commercial lease repair obligations can include:
- Internal repairs: walls, floors, ceilings, doors, windows, fixtures and decoration
- External repairs: shopfront, signage areas, guttering, brickwork or exterior doors
- Structural repairs: roof, foundations, load-bearing walls and main services
- Mechanical and electrical systems: air conditioning, heating, wiring, plumbing and extraction
- Statutory compliance: works needed because of health and safety, fire safety, accessibility or other legal requirements
You should also check whether the lease makes you responsible for damage caused by previous tenants, inherent defects, fair wear and tear, or damage covered by insurance.
At the end of the lease, the landlord may serve a schedule of dilapidations setting out alleged breaches of your repair obligations. The Pre-Action Protocol for Claims for Damages in relation to the Physical State of Commercial Property at Termination of a Tenancy often shapes how these claims are approached, but you don't want to rely on a dispute process to control a cost that could have been managed before signing.
What Should You Check Before Signing An FRI Lease?
You should check the lease wording, the actual condition of the premises and the commercial deal together, because one without the others won't give you the full picture.
A practical FRI lease review should start with the draft lease, but it shouldn't stop there. You need to compare the legal wording against what the building is actually like.
Your Pre-Signing Checklist
- Repair clause: does it cover only the inside, or also the structure, exterior and main services?
- Current condition: is there damp, cracking, leaks, old wiring, worn flooring or plant that may fail soon?
- Schedule of condition: is your repair obligation limited by photos and a written record?
- Service charge: can the landlord recover major works through service charge as well as direct repair obligations?
- Insurance clause: who chooses the insurer, what is covered and what can be recharged to you?
- Rent suspension: does rent stop if an insured risk makes the premises unusable, and is any rent review clear?
- End of lease obligations: what decoration, reinstatement and yielding up works are required?
- Break clause conditions: could a minor repair issue stop you serving a break notice or using a break right?
You should also read any heads of terms, lease side letters and service charge information. If the heads of terms say one thing and the lease says another, the lease will usually be the document that matters once signed.
The Code for Leasing Business Premises in England and Wales 2020, published by RICS, encourages clear heads of terms and fair negotiation of key lease points. It's not a substitute for advice, but it can be useful when asking for clearer terms.
Can A Schedule Of Condition Limit Your Repair Costs?
Yes, a schedule of condition can limit your repair costs if the lease clearly says your repair obligations are limited by it.
A schedule of condition is a record of the premises at the start of the lease. It usually includes dated photographs and written notes describing existing defects, wear and condition.
The key point is this: the schedule only helps if the lease wording links to it properly. It's not enough to have a folder of photos sitting on your phone.
Worked Example: How The Numbers Can Change
Say Maya's bakery signs a 5-year lease at £36,000 a year. Before signing, her surveyor finds water staining, a damaged rear door and old floor tiles. The landlord won't fix everything, but agrees to attach a schedule of condition and limit Maya's obligation so she doesn't have to put the premises into any better condition than shown in the schedule.
Three years later, the landlord raises end-of-lease repair issues. Without the schedule, Maya may have been asked to contribute £18,000 for plaster repairs, floor replacement and making good older damp damage. With the schedule, the older damp and floor condition are recorded at the start, so the discussion narrows to £3,500 for decoration and damage caused during her occupation.
The exact outcome always depends on the lease, evidence and surveyor input, but that kind of difference is why a schedule of condition is often worth arranging before completion.
Schedule Of Condition Outline
This outline can help you think through what to include, but it isn't a finished legal document. A lawyer and, where needed, a surveyor should tailor it before it's used.
- Property Details: identify the premises, lease parties and inspection date.
- Purpose: state that the record limits the tenant's repairing obligation where the lease says so.
- Inspection Method: explain whether the inspection was visual only and any areas not accessed.
- General Condition Summary: describe the overall state of the premises at lease start.
- Room-By-Room Notes: record defects, wear, staining, cracking, damage and missing items.
- Services And Plant: note the apparent condition of heating, cooling, plumbing, electrics and extraction, if visible.
- Photographic Schedule: attach clear, dated photos with labels matching the written notes.
- Landlord Works Or Exclusions: list agreed works the landlord will do, or items your business won't be responsible for.
- Sign-Off: include signatures or written approval from the landlord and tenant, if agreed.
Who Pays For Insurance Under A Full Repairing And Insuring Lease?
Usually, the landlord arranges building insurance and your business reimburses the premium or a fair proportion of it.
This is the insuring part of a full repairing and insuring lease. It doesn't normally mean you choose the building insurer yourself. It often means the landlord insures the building and recovers the cost from you as insurance rent or through the service charge.
You should check what the policy covers and what happens if something goes wrong. The insurance clause can affect cash flow, business interruption and your ability to keep trading.
Insurance Points To Check
- Insured risks: fire, flood, storm, escape of water and other named risks.
- Uninsured risks: who pays if the damage isn't covered or the insurer refuses a claim?
- Excess: are you responsible for paying the policy excess after an insured event?
- Rent suspension: does rent stop while the premises can't be used after insured damage?
- Reinstatement: how long does the landlord have to rebuild or repair after major damage?
- Terrorism cover: is it included, optional or separately charged?
- Premium evidence: can you ask for reasonable evidence of the premium being charged?
Building insurance doesn't replace your own business insurance. You may still need contents insurance, stock cover, public liability, employer's liability if you employ staff, product liability, cyber cover or business interruption insurance, depending on what your business does.
If you fit out the premises, check whether your improvements are covered under the landlord's policy or whether you need to insure them yourself. This is especially important for cafes, salons, clinics and studios that spend heavily on counters, plumbing, flooring, equipment and signage.
How Do You Negotiate FRI Terms Before You Sign?
You negotiate FRI terms by turning broad obligations into clear, costed and limited obligations that match the rent, term and condition of the premises.
Landlords don't always agree to every change, especially in a competitive market. Still, many FRI terms are negotiable before the lease is signed. After signing, your position is usually much harder.
Common Negotiation Points
- Limit repairs to the schedule of condition: so you don't have to improve existing defects.
- Exclude structural repairs: especially for shorter leases or older buildings.
- Cap service charge for major works: so surprise building costs don't overwhelm cash flow.
- Require landlord works before completion: for leaks, unsafe wiring, broken plant or access issues.
- Carve out inherent defects: so you aren't responsible for design or construction problems you didn't cause.
- Clarify insured damage: so you're not asked to repair damage that should be covered by the building policy.
- Protect your break clause: so small repair disputes don't block an agreed exit date.
It's also sensible to ask for the last few years of service charge accounts, planned works information and insurance premium details. If the landlord is planning roof works next year, you want to know before you commit.
For a very short lease or licence, a full FRI obligation may feel disproportionate. For a longer lease with lower rent, taking on more responsibility may be commercially acceptable if you've priced it into the deal. The right answer depends on your premises, budget and risk appetite.
Templates can be useful starting points, but they often miss the commercial details that matter most, such as the current state of the building, who controls the insurance and what happens at the end of the term. A tailored lease review can help you spot the clauses that are likely to cost real money.
Key Takeaways
- An FRI lease usually shifts repair and insurance costs onto your business, but the exact obligation depends on the lease wording.
- Don't rely on the label full repairing and insuring. Check whether you're responsible for internal, external, structural and service charge repairs.
- A survey and schedule of condition can protect you from paying to fix defects that existed before you moved in.
- Insurance clauses should explain who pays the premium, what is covered, when rent is suspended and what happens with uninsured risks.
- The best time to negotiate FRI terms is before signing, while the landlord still wants the deal to complete.
- Getting the lease reviewed early can help your business avoid costly disputes and budget for the premises properly.
If you'd like help with reviewing your commercial lease, negotiating repair and insurance clauses, preparing a schedule of condition or checking your lease risks before signing, you can reach us at 08081347754 or team@sprintlaw.co.uk for a free, no-obligations chat.
Drafted by Taylor, Sprintlaw's AI, and overseen by Alex Solo. How we write








